SAGA JAPAN knows how to deal with constraints regarding a spectacular operation. Indeed, 2 generators of 404 tons each were transported to ABU QIR Thermal Power Plan, situated at about 25 kilometers northeast from Alexandria, in Egypt.
Numerous obstacles have had to be dealt with:
• Egyptian Revolution and negotiation with the different
authorities
• Obstruction of some roads
• A bridge too weak which couldn't support the weight of the
generators: a new load system was created to transfer the total
weight of the load.
• …
SAGA knows how to face these difficulties and answer its clients' needs. This operation is another proof that You'll find the Solution you need with SAGA